Keeping this Ziploc® plant sealed up tight.
Polyfoam Roof / Acrylic Coating
ZIPLOC® BAG MANUFACTURING & WAREHOUSE FACILITY IN SEQUIN, TEXAS
THE CHALLENGE
The 25-year-old metal roof on this aging facility was in dire need of restoration, with failing curbs, worn fasteners and severe rust resulting in over 100 separate leaks. Adding to the urgency was the expected early arrival of record-breaking wet weather in this part of Texas.
THE PROCESS
Barrier determined that polyurethane foam was the only solution that could offer 100% adhesion to the existing roof system. Our trained technicians went to work installing a 2″ sprayed polyurethane foam roof system with acrylic coating and double granules to guard against hail.
THE RESULT
Barrier completed the facility’s new roofing system in early 2016, just in time for the onset of the expected horrific weather. Even with pounding torrential rains, the roof sustained not a single leak.
“For a project of this size, we were impressed by how quickly Barrier was able to assess our situation, develop a strategy and implement the solution. The clock was ticking, but these guys came through for us in a big way.”
Project Name: | ICC Stravinsk |
Location: | Sequin, TX |
Facility Type | Manufacturing & warehouse |
Square Footage: | 50,000 square feet |
Substrate | 25-year-old metal roof |
Square Footage | 198,000 |
Project Details
Categories:
Related Projects
CALL FOR YOUR FREE EVALUATION & ESTIMATE: 1-877-233-2003
RECENT PROJECTS
TESTIMONIALS
“In my business, time is money. I know the job is going to be done with Barrier, and I can move on to the next project.”
Having completed over 65 successful projects with Barrier Roofing as a part of the Span Construction team, I can without question recommend them for your next project.
Barrier nitro coating was applied to the walls, floor and ceiling in our new dairy milking barn. We are completely satisfied – not only is it very durable, but it also cleans up very well without much effort.”
Barrier put a polyurethane foam roof over 200,000 square feet at our facility, which has saved us over 30% on our energy bill – and without any leaks!